日本高清a一区视频在线免费观看_视频亚洲av_av男人天堂网_成人毛片18女人毛片免费看软件_最近的2019中文字幕3_琪琪中文久久字幕_久久久久久精品人妻免费视频 _97人人模人人爽人人喊免费从

NEWS

CURRENT:Home > News > Company news > News details

Know the equipment maintenance information and make your static mixer run more efficiently

DATE:2016-10-13

As a common industrial machine, static mixers are widely used in industry and manufacturing. In order to ensure the efficient operation of static mixers, we need to pay attention to many problems. Let's take a look at them.

1. Installation location
Static mixers should be installed in high-pressure operating rooms with excellent explosion-proof performance, and I need to separate them when multiple static mixers need to be installed, and should be separated by an explosion-proof wall between every two mixers. Avoid the interaction of the two mixing machines. There should be a passage to the outside in each operating room so that in the event of an accident, the operator can escape the danger zone as quickly as possible.

2. Check for damage
The package of the static mixer needs to be inspected immediately after opening, and the equipment is inspected for damage. The number of parts in the package is checked in the installation instructions to ensure that it is correct.

If the heating method of the static mixer is to use the heat transfer oil heating method, the corresponding heat transfer oil should be purchased according to the use temperature, and when adding the heat transfer oil to the equipment, we need to clamp the fuel filler port, and then tighten the fuel filler port after the oil filling work. To prevent the volatilization of gasoline.

3. Tight nut
The valve of the mixer and the pressure gauge need to be tightened to achieve the sealing effect. It is guaranteed that there will be no relative rotation at the two ends of the joint. Lubrication should be applied to all nuts and screw caps to avoid biting. Death phenomenon.

4. Check for leaks
After the static mixer is completely installed, a certain amount of nitrogen should be introduced into the equipment, and the equipment should be inspected to see if there is any air leakage. If air leakage occurs, we can use soap to find the leak. The leak is tightened to ensure that the equipment can operate normally and stably.

5. Cooling method
When the static mixer is cooled and cooled, the coolant circulation pipe can be used to achieve the cooling effect. It is important to use the quick cooling method for cooling.

When the internal temperature of the mixer exceeds 100 °C, the cooling water should be supplied to the equipment immediately, and the water temperature should not exceed 35 degrees Celsius to avoid the demagnetization of the magnetic steel.

Regarding the maintenance and usage precautions of the static mixer, we have already made a specific introduction with you in the above. For more details, you can log in to our company's official website for more detailed understanding.

< RETURN
  • Address: Shanghai Fengxian Industrial Zone No. 99 car line
  • Fax: 021-64544111
  • Email: xinruidu@xinruidu.com
  • Tel:021-54488893 17701693701
  • Sales Phone: 021-54488893 13901897168 17317632837
  • After sales call: 021-64544111 18930406998

Pay attention to Xinrui

高要市| 海丰县| 汶上县| 台中县| 连江县| 江安县| 宜章县| 贡嘎县| 佳木斯市| 玉田县| 互助| 磐石市| 连州市| 丹阳市| 柳河县| 乌海市| 工布江达县| 江城| 广元市| 博爱县| 谢通门县| 凌云县| 同心县| 德格县| 金川县| 湄潭县| 和政县| 德昌县| 曲阜市| 应城市| 中阳县| 南丹县| 景德镇市| 新建县| 忻州市| 麻城市| 内江市| 兴海县| 疏勒县| 合作市| 东港市|